Archive of July 2018

A Growing Problem

soil-samples-1200.jpg

The increased scrutiny of materials such as topsoils, driven primarily by the 2012 Olympic project, has for the most part been hugely advantageous for the landscaping industry, leading to large improvements in quality and accountability within a largely unregulated sector. However, when we are buying and selling materials that are as alive as the plants and shrubs they support, where does the supplier’s responsibility for the performance and quality of the material end? Over time, key elements such as pH, NPK and porosity levels are likely to fluctuate – so is there a liability when schemes and/or plants begin to underperform?

There is no doubt that the standard of soft landscaping materials has improved since 2012. Bourne Amenity’s budget for testing materials has quadrupled since the early Noughties, and we welcomed increased focus on compliance with specifications as a sign that our efforts to improve standards were becoming universal. However, projects are becoming more and more ambitious in increasingly inaccessible locations (e.g. rooftops). In those circumstances, if materials and substrates started out fulfilling a specification but deteriorate after delivery, storage and spreading, who is responsible for the costly remedy?

Our position has always been that – alongside our own regular testing protocols – we advise every contractor to employ independent testers to visit and sample from our facilities, in order to produce data that is relevant to a particular project and subsequent batch of material. Once the material has been approved, any issues from that moment onwards cannot be due to our processes. If, for example, the soil is handled poorly (most specifications outline the ideal handling methodology) during onsite preparations, or there are traces of contamination that were not present in the original samples, the accountability stops at the moment our material has been discharged on site. In cases where an onsite test has thrown up an irregular reading of, say, asbestos, it is more often than not a hangover from the original brownfield site. It is then the responsibility of the contractor to determine its origin.

The problem lies in allowing time for the testing and approval process. A standard BS 3882 topsoil test is likely to take seven to 10 days. If you include asbestos, lands must wait for the asbestos result to come back before further tests can take place. Consequently, you are looking at close to three weeks for the standard multipurpose BS 3882 topsoil test. The test will then only be valid for that batch (usually around 500m3), and once it is used up, another test must be undertaken, causing a further delay. More often than not, contractors are relying on old data relating to a batch of material that will never be delivered to their site. Suppliers are hard pressed to blend and store numerous 500m3 batches of material, due to storage limitations. It is therefore important for contractors and buyers to include cost and time provision for independent testing in their plan of works, and to ensure the supplier can store the required number of batches.

Many projects include subsequent tests once the material is in situ, and in these cases, the accountability of the testing process is crucial in the event of any discrepancy. If you cannot trace the test results to the same batch of material that was delivered to site, this is where arguments over accountability will surface.

As a company, we have learned to be extra vigilant when enforcing the rule that, once the material is discharged on site, it is no longer our responsibility. Arguments can occur when performance materials are badly managed on site, leading to an adverse effect on performance. Suppliers must ensure that material is compliant when it leaves their facility and upon discharge, responsibility passes to the client.

(This article originally appeared in Pro Landscaper magazine, July 2018, and is reproduced by kind permission from the publisher, Eljays44 Ltd.)

June photo competition results

10010851600optimised-2.jpg

Well! - another very close competition with many excellent entries. In particular, there were several excellent pictures of Bourne lorries in action - but we had decided to give preference to non-lorry images for the month of June. Therefore, the worthy winner is the above example of rural activities - the logo here is on Charlie's purpose-built compost spreader, operating in a lovely Sussex vineyard. The picture is by Peter Traill, who will receive his prize on the next suitable occasion.

Keep the photo entries coming - perhaps your snap will be the perfect image this month?

The GreenBlue Urban treepit trial

dscf13891200.jpg

On July 4th, GreenBlue Urban invited us to a Contractors' Day to show their offices and production facilities, launch their new RootSpace 400 soil cell system, and give a practical demonstration of how to use the system when planting a young tree in an urban environment. It was a very impressive demo and a short blog post would not do it justice. So, to get the full story, head on to this special page for a longer read with many photos. We are grateful to Louise and Lloyd at GreenBlue Urban for the invitation and help with the article!

Updated 13 July: GreenBlue Urban's report from the day, with video, is now available on this page.

British Sugar topsoil

dscf13461200.jpg

Last week, we were kindly invited by British Sugar to visit their factory in Wissington, Norfolk. It was not only interesting but great fun too, with our hosts having laid on a great package of study visits, ending up in a pub in Bury St Edmunds watching the football... but that's another story!

You may well wonder what the connection is between sugar and soil. It's simply this - every year British Sugar receive getting on for 10 million tonnes of sugar beet to their four factories in East Anglia. Although they beets have been cleaned to some extent at the farm, there deliveries still include something like 300,000 tonnes of soil, all of which is of course carefully washed off at the factories before the sugar production starts.

About twenty years ago, our generous host Andy Spetch came up with the idea of doing something better with this resource, rather than just dumping it. So now, the water used for washing the beets is pumped into big settlement ponds - you can see one in front of the factory in the picture above. In the pond, the washed-off soil separates into its sand, silt and clay components, which settle in different areas. These soil components are then excavated from the ponds, and laid out to dry on the fields. The drying process takes up to 2 years, after which the soil components are mixed in exact proportions, which results in a totally consistent standard product.

Wissington is the biggest of the soil production sites, and here Andy also mixes the standard product with sands and compost to produce a limited range of special-purpose materials.

All in all, it was both instructive and enjoyable (if a bit dusty when on-site) - many thanks to Andy and Kim for having us!

Beach volleyball in the City

ashleyoptimised.jpg

It's a tradition now - every summer we deliver 160 tonnes of RH37 sand (medium USGA sand) to Canary Wharf for Action for Kids' beach volleyball courts. This is the tenth year they lay on the event - it starts today (9 July) and carries on to 3 August (when there will be a lot of sweeping-up to do).

The event includes a number of tournaments featuring elite players, as well as amateurs in stirring moments like the Bartenders Tournament (tomorrow) and the Agencies Challenge Cup (on 27 July).

The picture shows two of our lorries lined up on Sunday morning, waiting to discharge some of all that sand.